EV Charger Installation Cost in Brisbane
If you have bought a charger, or your car came with one, our installation price starts at $999 including GST for single phase and $1,299 including GST for three phase. Those are installation-only prices for a straightforward job. This page explains what "straightforward" means, what pushes it higher, and why the cheapest install is not always the one that charges your car off your solar.
What the base price covers
A standard installation assumes the charger mounts on a wall within a reasonable cable run of your switchboard, the board has capacity and physical room for the new circuit, and no upgrade to your main supply is needed. On that basis you get the circuit run, the protective device, the mounting, the connection, testing and the electrical certificate.
We are quoting the electrical work. If you need us to supply the charger as well, that is priced separately and depends entirely on which unit suits your car, your phase configuration and whether you want solar-matched charging.
What adds to it
Cable run length
This is the most common variable by a distance. A charger on the garage wall beside the switchboard is a short run. A charger at a carport at the far end of the block, or on the opposite side of a two-storey house, can mean tens of metres of heavier cable, and on longer runs the cable has to be sized up to manage voltage drop. It is not unusual for the run to cost more than the base installation.
Switchboard capacity
An EV charger is a significant continuous load. Older Brisbane boards often have no spare ways, no RCD protection, or a main switch that was never sized with a 32 amp continuous load in mind. If the board needs work, that is quoted on top, and we will show you why.
Three phase versus single phase
Three phase costs more to install but charges substantially faster, and it changes what the car can draw. If you already have three phase to the property, it is usually worth using it. If you do not, upgrading to three phase purely to charge faster is rarely worth the cost unless there are other reasons to do it.
Load management and solar matching
This is the part most quotes leave out. A basic installation will charge your car at full rate whenever it is plugged in, including at 6pm when your house is already drawing hard and you are importing at peak rates. A charger set up with load management and solar diversion will instead track your export and charge the car on the surplus your panels are actually producing.
That requires a charger capable of it, a CT clamp or meter at the switchboard, and configuration. It adds to the installation, and for most households with solar it is the difference between an EV that is genuinely cheap to run and one that quietly increases your power bill.
Weatherproofing and mounting
An outdoor charger in a Brisbane summer needs an appropriate IP rating and sensible placement. A pedestal mount where there is no suitable wall is an additional cost. So is any trenching if the charger is detached from the house.
Charging off your solar, in practice
A typical Brisbane rooftop array produces its surplus in the middle of the day, when most cars are not home. There are three ways to bridge that gap, and they suit different households:
- Timed charging: schedule the car to charge during your solar window. Works if the car is home during the day, or if you have a cheap overnight rate worth targeting instead.
- Solar diversion: the charger modulates its draw to match your live export, so you charge on surplus only. Best for households where someone is home, or the car returns before the sun goes.
- Battery plus charger: the battery banks the midday surplus and the car draws from it in the evening. The most flexible option, and the most expensive.
Which one is right depends on when your car is actually at home. That is the first question we ask, and it matters more than the charger brand.
Apartments and shared parking
Charger installations in unit complexes are a different job, because they involve body corporate approval, metering that correctly bills the individual lot, and often a shared supply that was never designed for it. We do this work, but the process is slower and the quote depends heavily on the building. Start the body corporate conversation before you start getting quotes.
Common Questions
You may also be interested in:
Still have questions?